Case Study 09: CIS Solar Tower

CB_Case09.jpgUsing solar power in an office tower 

2004- Manchester

offices

UK

icon Download summary (74.17 kB)

icon Download full case (172.37 kB)

Summary of the case

 

The CIS Solar Tower project is a renewable energy initiative established by the Co-operative Financial Service (CFS) in Britain in 2004. The project aimed to resolve the damaged building structure, which had existed six months after the building was built in 1962. In cooperation with the organisation’s ethos and business strategy, it had decided to adopt the solar photovoltaic panels to resolve the problematic issue.

 

Initially the main target for the initiative was the building as a whole. As a grade listed building, there were concerns over the new development. Guidelines and restrictions were made to ensure the preservation of historical feature and value of the building. The emblematic and symbolic significance of the building and the issue of climate change have both been seen as priorities for the participating organisations and stakeholders.

 

The project’s cost was approximately £5.5 million, with significant financial support from national government and public agencies. The media frequently published the claim that the initiative was the largest solar tower in Europe. The project has received considerable and widespread praise and support for adopting the renewable energy system. But despite this, the environmental contribution generated from the solar technology has been uncertain.

 

 